proekti8

ANALYSIS OF THE POTENTIAL FOR REGIONAL AND TRANSPORT DEVELOPMENT OF THE BURGAS PORT AS PART OF THE DANUBE – BLACK SEA MULTI- PORT REGION

CLIENT:

MUNICIPALITY BURGAS

PERIOD:
12/2017

THE MAIN OBJECTIVE OF THE REPORT PREPARATION OF AN ANALYSIS – WITH ADDITIONAL DOCUMENTS AND INFORMATION PRESENTED IN THE FORM OF MAPS AND GRAPHICS – TO SERVE AS VISION AND GOALS FOR THE DEVELOPMENT OF THE BURGAS PORT FOR THE PERIOD UP TO 2040 SO AS TO INCREASE THE USE OF WATER TRANSPORT, AND TO ATTRACT CARGO FROM THE ROAD AND RAILWAY TRANSPORT TO AND FROM THE PORT OF BURGAS.

THE FOLLOWING SPECIFIC OBJECTIVES WERE ACHIEVED THROUGH THE PROJECT:

  • IDENTIFICATION OF THE POTENTIAL TYPES OF CARGO THAT CAN BE TRANSPORTED BETWEEN THE DANUBE PORTS AND BURGAS PORT. REQUIRED INFRASTRUCTURE. BARRIERS TO BUSINESS;
  • IDENTIFICATION OF PROBLEMS THAT IMPEDE THE FURTHER DEVELOPMENT AND IMPROVEMENT OF PORT INFRASTRUCTURE;
  • IDENTIFYING THE PROSPECTS FOR MORE EFFICIENT USE OF PORT INFRASTRUCTURE CAPACITY;
  • INDICATION OF THE POSSIBILITIES FOR IMPROVING THE SERVICE OF THE SHIPS AS A PREREQUISITE FOR INCREASING THE BENEFICIAL EFFECTS OF THE CARGO TRANSPORT ACTIVITY OF THE MARITIME TRANSPORT;
  • INDICATION OF THE POSSIBILITIES FOR CHANGING OF THE TYPES OF TRANSPORT (MULTIMODAL TERMINALS) IN CARGO HANDLING THROUGH THE PORT OF BURGAS;
  • REVIEW OF THE CONDITION OF THE TRANSPORT (MARITIME TRANSPORT) AND LOGISTICS SECTOR IN THE BURGAS REGION AND ITS CONTRIBUTION TO THE SOCIO-ECONOMIC DEVELOPMENT OF THE COUNTRY, INCLUDING THE CONNECTIONS AND THE POTENTIAL FOR DEVELOPMENT OF THE INDUSTRIAL ZONES IN THE BURGAS REGION;
  • REVIEW OF THE TRENDS IN TRANSPORT AND LOGISTICS DEVELOPMENT AND ANTICIPATED PLACE OF THE DANUBE AND INLAND WATERWAY TRANSPORT IN THE FUTURE.

THE PROJECT IS FUNDED BY “DANUBE 2014-2020” TRANSNATIONAL COOPERATION PROGRAM, PRIORITY AXIS 3: IMPROVED CONNECTIVITY OF THE DANUBE REGION, SPECIFIC OBJECTIVE “SUPPORTING ENVIRONMENTALLY SOUND AND SAFE TRANSPORT SYSTEMS AND BALANCED ACCESSIBILITY OF URBAN AND RURAL AREAS

3

HUMAN RESOURCES PLANNING AT THE NATIONAL RAILWAY INFRASTRUCTURE COMPANY AND HOLDING BULGARIAN STATE RAILWAYS EAD. TECHNICAL ASSISTANCE AND TRAINING TO IMPROVE MANAGEMEN

CONTRACTING AUTHORITY:

MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATION

PERIOD:
09/2012 – 09/2013

THE FOLLOWING ACTIVITIES WERE INCLUDED IN THE PROJECT:

• ORGANISATIONAL AUDIT IN THE TARGET GROUPS;
• STRATEGIC FRAMEWORK FOR HUMAN CAPITAL MANAGEMENT AND DEVELOPMENT WITHIN TARGET GROUPS;
• STRATEGIC PLANNING;
• ORGANISATIONAL FRAMEWORK;
• DEVELOPMENT AND DELIVERY OF A PROGRAMME FOR TRAINING OF THE SENIOR STAFF IN THE TARGET GROUPS.

THE PROJECT IS CO-FINANCED BY THE EUROPEAN REGIONAL DEVELOPMENT FUND IN THE PRIORITY ASSIST “TECHNICAL ASSISTANCE” OF THE OPERATIONAL PROGRAMME “TRANSPORT” 2007-2013.

1

ORGANIZATION OF TAILOR-MADE TRAININGS

CONTRACTING AUTHORITY:

EXECUTIVE AGENCY “RAILWAY ADMINISTRATION”

PERIOD:
02/2014 – 09/2014

„INFRACARE“ AD TOGETHER WITH THE BULGARIAN COMPANY „TINSA” EOOD ORGANIZED AND CONDUCT TAILOR-MADE TRAINING ON TOPICS DEFINED BY THE CONTRACTING AUTHORITY, RELATED TO THE SPECIFIC ACTIVITIES OF THE EMPLOYEES AT EXECUTIVE AGENCY “RAILWAY ADMINISTRATION”, AS WELL AS TRAINING OF EMPLOYEES FOR BUILDING UP MAIN COMPETENCIES IN ENGLISH.

THE MAIN OBJECTIVE OF THE PROJECT IS:

  • INCREASING THE QUALIFICATION AND COMPETENCE OF THE STAFF IN THE EXECUTIVE AGENCY “RAILWAY ADMINISTRATION” AND BUILDING ON GOOD PROFESSIONALS WHO HAVE THE NECESSARY KNOWLEDGE AND SKILLS TO MEET THE REQUIREMENTS OF THE LABOR MARKET AND THE CONSTANTLY INCREASING DEMANDS FROM LEADERS IN THE ADMINISTRATION, WITH REGARD TO THE PROFESSIONAL QUALIFICATIONS AND SKILLS OF THE EMPLOYEES;
  • ESTABLISHMENT OF AN EFFECTIVE SYSTEM FOR TRAINING AND CAREER DEVELOPMENT BY PROVIDING APPROPRIATE SKILLS AND COMPETENCIES THROUGH TRAININGS WILL STIMULATE CONTINUOUS EDUCATION AND MOTIVATION OF THE EMPLOYEES IN THE EXECUTIVE AGENCY “RAILWAY ADMINISTRATION”;

TAILOR-MADE TRAINING:

  • COMMISSIONING OF STRUCTURAL SUBSYSTEMS AND RAILWAY VEHICLES;
  • COMMON SAFETY METHODS IN RAILWAY TRANSPORT AND RISK ASSESSMENT;
  • ISO TRAINING ON STANDARDS 9001-2008 AND 19011/2011;
  • TRAINING OF INTEROPERABILITY IN THE RAILWAY TRANSPORT.

FOREIGN LANGUAGES TRAINING:

  • ENGLISH LANGUAGE (BASIC COURSE);
  • ENGLISH LANGUAGE (INTER MEDIUM);
  • ENGLISH LANGUAGE (ADVANCED).

THE PROJECT IS IMPLEMENTED WITH THE FINANCIAL SUPPORT OF OPERATIONAL PROGRAMME “ADMINISTRATIVE CAPACITY” 2007-2013, CO-FINANCED BY THE EUROPEAN UNION THROUGH THE EUROPEAN SOCIAL FUND.

4

ORGANIZATION AND PROVISION OF TAILOR-MADE TRAINING OF EMPLOYEES OF THE ADMINISTRATION OF VITOSHA SOFIA MUNICIPALITY

CONTRACTING AUTHORITY:

DISTRICT VITOSHA – SOFIA MUNICIPALITY

PERIOD:

01/2015 – 03/2015

„INFRACARE“ AD TOGETHER WITH THE BULGARIAN PARTNER „ITAL 1” EOOD ORGANIZED AND CONDUCT TAILOR-MADE TRAININGS FOR THE EMPLOYEES OF THE ADMINISTRATION OF DISTRICT VITOSHA – SOFIA MUNICIPALITY TO ACQUIRE SPECIFIC COMPETENCES FOR WORKING WITH SOFTWARE PRODUCTS, LANGUAGE COMPETENCES AND SUCH IN THE FIELD OF CONSTRUCTION, PARK DEVELOPMENT AND LANDSCAPING.

THE FOLLOWING RESULTS WERE ACHIEVED WITH THE IMPLEMENTATION OF THIS PROJECT:

  • SPECIALIZED TRAINING OF THE EMPLOYEES OF THE REGIONAL ADMINISTRATION – VITOSHA, IN ACCORDANCE WITH THE ESTABLISHED NEEDS AND PREFERENCES;
  • ESTABLISHED NEEDS, AREAS AND THEMES FOR FUTURE DEVELOPMENT ON SPECIFIC TRAINING OF TARGET GROUPS;
  • CONDUCTED TRAININGS FOR ENHANCING THE CAPACITY AND EFFICIENCY FOR INTERACTION – INTERNAL AND BETWEEN DIRECTORIES AND DEPARTMENTS IN THE ADMINISTRATION – REPRESENTATIVES OF THE TARGET GROUP;
  • PROVIDED PUBLIC AWARENESS, ACCESS AND PARTICIPATION OF STAKEHOLDERS И ОПОВЕСТЯВАНЕ ПРИНОСА НА ЕСФ И Р. БЪЛГАРИЯ;
  • PROVIDED EFFECTIVE IMPLEMENTATION, COMPLIANCE WITH THE LEGISLATION AND RULES OF OPERATIVE PROGRAMME “ADMINISTRATIVE CAPACITY” (OPAC) CONCERNING THE IMPLEMENTATION OF ACTIVITIES THE EXPENDITURE OF PROJECT BUDGET FUNDS.

THE PROJECT IS FINANCED BY THE OPERATIONAL PROGRAM “ADMINISTRATIVE CAPACITY” 2007-2013.

1

TRAINING AND PROFESSIONAL CONSULTATIONS ON THE IMPLEMENTATION OF BDS EN 50126-1: 2006, BDS EN 50159: 2010 STANDARDS, ESTABLISHED BY THE EUROPEAN COMMITTEE FOR ELECTROTECHNICAL STANDARDIZATION (CENELEC)

CONTRACTING AUTHORITY:

„BALKANTEL“ OOD

PERIOD:
02/2018 – 03/2018

THE MAIN OBJECTIVE OF PROJECT IS TO ENHANCE THE QUALIFICATIONS OF THE EMPLOYEES’ OF “BALKANTEL” OOD THROUGH TAILOR-MADE TRAININGS AND CONSULTATIONS.

TO BE ENSURED THE MANUFACTURE OF PRODUCTS IN TERMS OF HIGH RELIABILITY, FAIL SAFE AND WORK IN CONDITIONS OF HIGH LEVEL OF SAFETY, “INFRACARE” AD CONDUCTED TRAININGS AND CONSULTATIONS TO THE EMPLOYEES OF “BALKANTEL” OOD IN THE PROCESS OF IMPLEMENTATION OF THE HIGH REQUIREMENTS OF THE STANDARDS BDS EN 50126-1: 2006 AND BDS EN 50159: 2010, WHICH ARE ESSENTIAL FOR THE MANUFACTURE OF THE PRODUCT RADIS.

THE FOLLOWING RESULTS HAVE BEEN ACHIEVED:

  • SPECIALIZED TRAINING OF THE EMPLOYEES OF BALKANTEL LTD FOR DEVELOPING SKILLS FOR THE IMPLEMENTATION OF THE STANDARDS BDS EN 50126-1: 2006 AND BDS EN 50159: 2010, CREATED BY THE EUROPEAN COMMITTEE FOR ELECTROTECHNICAL STANDARDIZATION (CENELEC);
  • PROVIDING PROFESSIONAL CONSULTATIONS ON THE IMPLEMENTATION OF BDS EN 50126-1: 2006, BDS EN 50159: 2010 STANDARDS ESTABLISHED BY (CENELEC);
  • PROVIDED PUBLIC AWARENESS;
  • ENSURED EFFECTIVE IMPLEMENTATION, COMPLIANCE WITH THE RULES AND LEGISLATION OF OP “INNOVATION AND COMPETITIVENESS

THE PROJECT IS FINANCED BY THE STRUCTURAL FUNDS OF THE EU AND THE STATE BUDGET UNDER OPERATIONAL PROGRAMME “INNOVATION AND COMPETITIVENESS” 2014-2020. THE PROJECT IS CO-FINANCED BY THE EUROPEAN UNION THROUGH THE EUROPEAN REGIONAL DEVELOPMENT FUND UNDER THE PROJECT “IMPLEMENTATION OF AN INNOVATIVE PRODUCT AND MARKETING OF VOICE COMMUNICATION DEVICE FOR THE ‘RADIS’ DISPATCH CENTER”.

2

RE-ENGINEERING THE RAILROAD MAINTENANCE, TRAFFIC CONTROL AND ENERGY DISTRIBUTION IN THE NATIONAL RAILWAY INFRASTRUCTURE COMPANY

CONTRACTING AUTHORITY:

MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGIES AND COMMUNICATIONS (MTITC)

PERIOD:
09/2012 – 04/2013

INFRACARE AD TOGETHER WITH THE GERMAN PARTNER „TRANSCARE” GmbH CARRIED OUT DEPTH ANALYSIS AND OBJECTIVE ASSESSMENT OF THE MARKET DEMAND FOR RAILWAY PASSENGER SERVICES OF THE REPUBLIC OF BULGARIA AND DEVELOP MEASURES FOR THEIR OPTIMIZATION. THE FOLLOWING ACTIVITIES WERE INCLUDED IN THE PROJECT:

THE FOLLOWING ACTIVITIES WERE INCLUDED IN THE PROJECT:

  • PREPARING AN ANALYSIS OF THE QUALITY AND SCOPE OF PASSENGER RAILWAY SERVICES PROVIDED ON THE TERRITORY OF THE REPUBLIC OF BULGARIA.
  • IDENTIFICATION OF COMMERCIALLY VIABLE PASSENGER SERVICES BY RAIL.
  • DESIGN A DATABASE MODEL AND MONITORING PROCEDURES FOR THE PASSENGER TRANSPORT SERVICES BY RAIL.
  • DEVELOP PROPOSALS FOR OPTIMIZING THE COSTS OF PASSENGER TRANSPORT SERVICES BY RAIL.
  • MARKETING STRATEGY OF BDZ PASSENGER SERVICES EOOD FOR DEVELOPMENT OF PASSENGER RAILWAY TRANSPORT SERVICES.
  • ELABORATING MEASURES FOR OPTIMISATION OF ACTIVITIES OF BDZ PASSENGER SERVICES EOOD, INCLUDING A PROPOSAL FOR IMPROVING THE EFFECTIVENESS OF THE CONTRACT FOR PROVISION OF PUBLIC RAILWAY TRANSPORT SERVICES ON THE TERRITORY OF THE REPUBLIC OF BULGARIA.

THE PROJECT IS CO-FINANCED BY THE EUROPEAN REGIONAL DEVELOPMENT FUND IN THE PRIORITY ASSIST “TECHNICAL ASSISTANCE” OF THE OPERATIONAL PROGRAMME “TRANSPORT” 2007-2013.

1

ASSESSMENT OF THE MARKET DEMAND FOR RAIL TRANSPORT PASSENGER SERVICES IN THE REPUBLIC OF BULGARIA AND DEVELOPMENT OF SERVICE OPTIMIZATION MEASURES

ASSESSMENT OF THE MARKET DEMAND FOR RAIL TRANSPORT PASSENGER SERVICES IN THE REPUBLIC OF BULGARIA AND DEVELOPMENT OF SERVICE OPTIMIZATION MEASURES

CONTRACTING AUTHORITY:

MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGIES AND COMMUNICATIONS (MTITC)

PERIOD:
09/2012 – 04/2013

INFRACARE AD TOGETHER WITH THE GERMAN PARTNER „TRANSCARE” GmbH CARRIED OUT DEPTH ANALYSIS AND OBJECTIVE ASSESSMENT OF THE MARKET DEMAND FOR RAILWAY PASSENGER SERVICES OF THE REPUBLIC OF BULGARIA AND DEVELOP MEASURES FOR THEIR OPTIMIZATION.

THE FOLLOWING ACTIVITIES WERE INCLUDED IN THE PROJECT:

  • PREPARING AN ANALYSIS OF THE QUALITY AND SCOPE OF PASSENGER RAILWAY SERVICES PROVIDED ON THE TERRITORY OF THE REPUBLIC OF BULGARIA.
  • IDENTIFICATION OF COMMERCIALLY VIABLE PASSENGER SERVICES BY RAIL.
  • DESIGN A DATABASE MODEL AND MONITORING PROCEDURES FOR THE PASSENGER TRANSPORT SERVICES BY RAIL.
  • DEVELOP PROPOSALS FOR OPTIMIZING THE COSTS OF PASSENGER TRANSPORT SERVICES BY RAIL.
  • MARKETING STRATEGY OF BDZ PASSENGER SERVICES EOOD FOR DEVELOPMENT OF PASSENGER RAILWAY TRANSPORT SERVICES.
  • ELABORATING MEASURES FOR OPTIMIZATION OF ACTIVITIES OF BDZ PASSENGER SERVICES EOOD, INCLUDING A PROPOSAL FOR IMPROVING THE EFFECTIVENESS OF THE CONTRACT FOR PROVISION OF PUBLIC RAILWAY TRANSPORT SERVICES ON THE TERRITORY OF THE REPUBLIC OF BULGARIA.

THE PROJECT IS CO-FINANCED BY THE EUROPEAN REGIONAL DEVELOPMENT FUND IN THE PRIORITY ASSIST “TECHNICAL ASSISTANCE” OF THE OPERATIONAL PROGRAMME “TRANSPORT” 2007-2013.

1

MEASURING OF THE DYNAMIC INTERACTION BETWEEN PANTOGRAPH AND CONTACT WIRE IN THE DIMITROVGRAD – SVILENGRAD SECTION

CONTRACTING AUTHORITY:

NATIONAL RAILWAY INFRASTRUCTURE COMPANY (NRIC)

PERIOD:
11/2014 – 12/2014

INFRACARE AD HAS CONDUCTED MEASUREMENTS OF DYNAMIC INTERACTION BETWEEN PANTOGRAPH AND OVERHEAD CONTACT LINE IN THE RAILWAY SECTION DIMITROVGRAD –
SVILENGRAD FROM KM 231+560 IN YABALKOVO – DIMITROVGRAD RAILWAY SECTION TO KM 297+750 IN SVILENGRAD – TURKISH BORDER RAILWAY SECTION ACCORDING TO REQUIREMENTS OF TECHNICAL SPECIFICATION FOR INTEROPERABILITY ENERGY AND STANDARD EN50317:2002 WITH EMPLOYER NATIONAL RAILWAY INFRASTRUCTURE COMPANY (NRIC).

MAIN PROJECT TASKS:

  • PROVISION OF TRAIN OF TWO LOCOMOTIVES TYPE 1116 OF RAIL CARGO, EQUIPPED WITH EC PANTOGRAPHS;
  • SELECTION OF CONTROL SECTION FOR MEASUREMENTS IN THE DIMITROVGRAD – SVILENGRAD RAILWAY SECTION AND PROVIDING OF TRACK POSSESSION;
  • INSTALLATION OF MEASUREMENT EQUIPMENT IN THE TWO LOCOMOTIVES;
  • MEASUREMENT OF DISTANCE, SPEED, TIME, CURRENT AND DURATION OF ARC APPEARING BETWEEN THE PANTOGRAPH AND THE CONTACT WIRE AT DECLARED RAILWAY LINE SPEED OF 160 KM/H (200 KM/H);
  • MEASUREMENT OF UPLIFT AT THE SUPPORT DURING THE MOVEMENT OF THE TRAIN WITH TWO LOCOMOTIVES.
1

DEVELOPMENT OF A PRELIMINARY BUSINESS PLAN FOR NEW REGULAR RAILWAY SERVICE FOR TRANSPORT OF MULTIMODAL LOAD UNITS FROM PORT OF BURGAS (REPUBLIC OF BULGARIA) TO FREE ZONE PIROT (SERBIA)

КЛИЕНТ:

ИЗПЪЛНИТЕЛНА АГЕНЦИЯ “МОРСКА АДМИНИСТРАЦИЯ“ (ИАМА)

ПЕРИОД:
11/2014 – 12/2014

ИНФРАКЕЪР АД изготви предварителен бизнес план, целящ да развие нова редовна железопътна услуга за превоз на мултимодални единици товари по направлението пристанище Бургас (Република България) – Свободна зона Пирот (Република Сърбия).

Основната цел на проекта беше да се подобрят и популяризират връзките между пристанище Бургас и хинтерланда чрез железопътен транспорт, като по-евтина и екологосъобразна алтернатива на превоза с камиони, което да осигури повече товари и да повиши конкурентоспособността на пристанището.

Основните задачи по проекта бяха:

  • Насърчаване на устойчивото развитие на товарния транспорт;
  • Оптимизиране на съществуващите операции на железопътния и морски транспорт;
  • Развитие на интермодален транспорт;
  • Идентифициране на социални и икономически цели.

В разработката е направена оценка на въздействието на околната среда от евентуалното прехвърляне на товарите от пътен към железопътен транспорт.

Проектът беше възложен в изпълнение на дейност 7.1 от работен пакет 7 „Осъществяване на пилотен проект” от проекта „Мултимодална платформа Адриатическо море – река Дунав – Черно море”/ Adriatic-Danube-Black Sea multimodal platform/ (ADB multiplatform), съфинансиран със средства по Оперативна програма за транснационално сътрудничество „Югоизточна Европа” 2007 – 2013 г.

1

ELABORATION OF A CONCEPT FOR DEVELOPMENT OF THE BULGARIAN PORTS OF NATIONAL IMPORTANCE ON THE BASIS OF EXPECTED CARGO TRAFFIC VOLUMES

CONTRACTING AUTHORITY:

BULGARIAN PORTS INFRASTRUCTURE COMPANY)

PERIOD:
08/2014 – 01/2015

INFRACARE AD TOGETHER WITH THE NETHERLAND РARTNER MARITIME TRANSPORT BUSINESS SOLUTIONS B.V. ELABORATED A CONCEPT FOR THE DEVELOPMENT OF THE BULGARIAN PORTS OF NATIONAL IMPORTANCE WITH A VIEW TO IMPROVING THE TECHNICAL CAPABILITIES, TECHNOLOGY AND ORGANISATION OF WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE EUROPEAN STANDARDS, AND BRINGING THE PORT FACILITIES IN LINE WITH THE NATIONAL AND INTERNATIONAL ENVIRONMENT PROTECTION REQUIREMENT. THE CONCEPT HAS BEEN ELABORATED IN ACCORDANCE WITH THE GUIDELINES AND LEGISLATION OF THE COMMUNITY AND THE STRATEGY FOR DEVELOPMENT OF THE TRANSPORT INFRASTRUCTURE AND THE LEGISLATION OF THE REPUBLIC OF BULGARIA.

MAIN ACTIVITIES INCLUDED IN THE PROJECT:

  • ANALYSIS OF THE CURRENT STATUS AND DEVELOPMENT TENDENCIES OF THE SECTOR FOR INTERNATIONAL TRANSPORT OF PASSENGERS AND CARGO AS PART OF PORT OPERATIONS (ANALYSIS OF CARGO/PASSENGER FLOWS HANDLED BY/CROSSING THE PORTS);
  • PROGNOSIS OF CARGO TRAFFIC VOLUMES THAT WILL BE HANDLED BY THE PORTS;
  • ANALYSIS OF THE STRATEGIC FACTORS THAT HAVE AN IMPACT ON THE PORT SECTOR;
  • ANALYSIS OF THE SUPPLY AND DEMAND FOR TRANSPORT SERVICES AT THE PORTS;
  • OPTIONS FOR FUNDING THE DEVELOPMENT OF THE PORTS BY EU AND/OR OTHER FUNDS, PROGRAMMES AND DONORS;
  • DEVELOPMENT AND MODERNIZATION OF CARGO HANDLING TECHNOLOGIES;
  • THE BULGARIAN PORTS AND THEIR ROLE IN THE PAN-EUROPEAN TRANSPORT CORRIDORS;
  • SWOT ANALYSIS OF BULGARIAN PORTS OF NATIONAL IMPORTANCE BY REGIONS.

THE PROJECT IS CO-FUNDED BY THE STRUCTURAL FUNDS OF THE EU AND THE STATE BUDGET UNDER OPERATIONAL PROGRAMME “TRANSPORT” 2007-2013.